Soldering Profiles
Zarlink Semiconductor and our contractors evaluate products and their reflow classification temperatures in accordance with the IPC/JEDEC standard J-STD-020 as follows:
Products Using Pb-Free Process
Products Using SnPb Eutectic Process (limited availability)
Pkg. Thickness <1.6 mm 260°C Pkg. Thickness 1.6-2.5 mm and Volume <350 mm3 260°C Pkg. Thickness 1.6-2.5 mm and Volume 350-2000 mm3 250°C Pkg. Thickness 1.6-2.5 mm and Volume >2000 mm3 245°C Pkg. Thickness >2.5 mm and Volume <350 mm3 250°C Pkg. Thickness >2.5 mm and Volume ≥350 mm3 245°C
Pkg. Thickness ≥2.5 mm 220°C Pkg. Thickness <2.5 mm and Volume <350 mm3 235°C Pkg. Thickness <2.5 mm and Volume ≥350 mm3 220°C
The graphical image and corresponding table below show the typical soldering profile conditions used for Zarlink Semiconductor devices based on assembly materials and type.
Profile
Profile Feature Sn-Pb Eutectic Assembly Pb-Free Assembly Preheat
- Temperature Min (Tsmin)
- Temperature Max (Tsmax)
- Time (min to max) (ts)
100°C
150°C
60-120 seconds
150°C
200°C
60-120 secondsTsmax to Tp - Ramp-up Rate 3°C/second max. 3°C/second max. Time maintained above: - Temperature (TL) 183°C 217°C - Time (tL) 60-150 seconds 60-150 seconds Peak package body temperature (Tp) Refer to previous table Refer to previous table Time (tp) within 5°C of classification temperature (Tc) 20 seconds 30 seconds Ramp-down Rate (Tp to Tsmax) 6°C / second max. 6°C / second max. Time 25°C to Peak Temperature 6 minutes max. 8 minutes max.
Notes
1. All temperatures refer to topside of the package, measured on the package body surface. 2. These reflow profiles are for classification/preconditioning and are not meant to specify board assembly profiles 3. SMD packages previously classified to a given moisture sensitivity level by using previous revisions of J-STD-020 do not require reclassification unless a change in level or peak temperature is desired.
Hot News
- Feb 3, 2010 - Product Zarlink and Freescale Target Wireless Network Upgrades to Support High Bandwidth Smartphone Services
- Jan 28, 2010 - Corporate Zarlink Third Quarter Fiscal 2010 Revenue Exceeds Guidance
- Jan 18, 2010 - Corporate Zarlink Reconfirms Timing of Third Quarter Earnings Release